Below you will find a selection of our references to give you an overview of our capabilities.
Customer: |
Linz Strom GmbH |
|
Scope of work: |
Engineering, supply, assembly and commissioning, testing, training and documentation of complete of flue gas cleaning plant (desulphurization, denitrification, heavy metal removal, dust removal, dioxin and furan removal). |
|
Technology: |
Bag house filter, two-stage wet limestone scrubbing and SCR-catalyst. |
|
Technical data: |
Capacity: |
190,000 Nm³/h (flue gas volume / stack) |
|
Flue gas temperature: |
180 degrees |
Execution period: |
2009-2012 |
Customer: |
WKU - Wiener Kommunal-Umweltschutzprojektgesellschaft m.b.H. |
|
Scope of work: |
Engineering, supply, assembly and commissioning, testing, training and documentation of the flue gas cleaning system – two lines. |
|
Technology: |
Two-stage wet limestone scrubbing including sewage treatment plant, activated carbon and SCR (Selective Catalytic Reduction). |
|
Technical data: |
Flue gas volume: | 88,000 Nm³/h (flue gas volume / stack) |
Flue gas temperature: | 160 degrees |
|
Execution period: |
2005-2009 |
Customer: |
Martin GmbH für Umwelt- und Energietechnik |
|
Scope of work: |
Engineering, delivery, assembly and commissioning, testing, training and documentation of complete flue gas cleaning plant (desulphurisation and dust removal) for the residual waste removal plant in Suhl / Southwest Thüringen (GER). |
|
Technology: |
Semi-dry desulphurisation, spray absorber, bag house filter. |
|
Technical data: |
Waste througput: |
160,000 t/a |
|
Flue gas volume: |
134,500 Nm³/h (flue gas volume / stack) |
|
Flue gas |
180 degrees |
Execution period: |
2003-2008 |
Customer: |
EBARA Corporation |
|
Scope of work: |
Design and layout, basic and detail engineering, delivery, assembly and commissioning, testing, training and documentation of water-steam cycle, turbine piping and cooling water system for the combustion plant at Industrial Estate in Frankfurt am Main (GER). |
|
Technical data: |
Main steam: | 330 t/h |
Temperature: | 460 degrees | |
Pressure: | 68 bar | |
Electrical power: | 86 MW | |
Total weight: | Piping system: app. 1,000 t Equipment: app. 450 t |
|
Material: | St37 / P235GH / P265GH / 16Mo3 / 10CrMo9-10 / 13CrMo4-5 / P91 / 1.4301 / 1.4571 / PP / PE / GFK | |
Execution period: |
2007-2010 |
Customer: |
Fernwärme Wien Gesellschaft m.b.H. |
|
Scope of work: |
General contractor (engineering, supply, assembly and commissioning, testing, training and documentation) for construction of the fluidized-bed incinerator and flue gas cleaning plant, water-steam cycle with district heating extraction, construction works, electrical, electrical, control and instrumentation as well as automation. |
|
Technology: |
Fluidized-bed combustion EBARA-ROWiTEC®, waste heat boiler, electrical precipitator, two-stage wet limestone scrubbing, activated carbon adsorber and SCR (Selective Catalytic Reduction). |
|
Technical data: |
Waste throughput: |
100,000 t/a municipal waste and sewage sludge |
Combustion capacity: |
38 MWth |
|
Main steam: |
47 t/h / 53 bar / 350 degrees |
|
Flue gas volume: |
80,000 Nm³/h |
|
Execution period: |
2001-2004 |