Below you will find a selection of our references to give you an overview of our capabilities.
Customer: |
Siemens AG Austria |
|
Scope of work: |
Engineering, suppy and assembly of complete BoP (I) and piping systems (ND, MD, HD), cooling water system and district heating extraction (II) for gas-combined cycle power plant (2x400 MW) in Mellach (A). |
|
Technical Data I: |
Weight: |
app. 1,300 t |
Material: |
X10CrMoVNb9-1/ 10CrMo9-10 13CrMo4-5/ 16Mo3/ P265GH P235GH/ P195GH/ 1.4541 |
|
Dimension: |
DN6-DN1500, PN16-PN320 |
|
Technical Data II: |
Weight: |
Piping system: app. 560 t |
Material: |
P235GH/ L360NB/ 1.4571 |
|
Dimension: |
PE 100: DN15-DN900 to PN40 |
|
Execution period: |
2009-2011 |
Customer: |
Lenzing AG / Attisholz Infra AG |
|
Scope of work: |
Disassembly, relocation and reassembly of complete turnkey evaporation plant including compressor. |
|
Technical Data: |
Weight: |
380 t equipment |
Material: |
V4A |
|
Dimension: |
DN15-DN1250 to PN25 |
|
Execution period: |
2010 |
Customer: |
Jungbunzlauer Austria AG |
|
Scope of work: |
Complete piping in stainless steel including primary- and secondary steel as well as piping of cooling tower, fermentation chambers and boiler house for the raw material plant Pernhofen (A). |
|
Technical data: | Weight: | 575 t piping systems 125 t steel construction V2A |
Material: | 1.4571, 1.4301, P235GH | |
Dimension: |
DN10-800 to PN16 | |
Execution period: |
2008-2009 |
Customer: |
Petrom S.A. |
|
Scope of work: |
Mechanical work, piping and equipment assembly including commissioning for the modernization project called „Gas Oil Hydrotreating“ HDS-plant in the refinery Petrobazi, Ploiesti (RO). |
|
Technical data: |
Weight: |
550 t piping systems |
Material: |
LTCS1.5, LTCS1.5+PWHT/SR, LTCS3.0, LTCS3.0+PWHT/SR, 1.25CR3.0+PWHT/SR, 304SS0, 316SS1.5 Mod |
|
Dimension: |
DN20-DN400, ANSI150-900 |
|
Execution period: |
2007-2008 |
Customer: |
AE&E Austrian Energy & Environment |
|
Scope of work: |
Complete assembly of blast furnace gas-fired boiler Block 07, steel construction work, equipment, pressure parts, complete piping and support as well as installation of SCR-plant. VA-Block 07: 160 MWel. |
|
Technical data: |
Weight: |
5,200 t |
Material: |
16Mo3, 13CrMo4-5, 10CrMo9-10, P265GH, X10CrMoVNb9-1, 15NICuMoNb5-6-4 |
|
Dimension: |
DN10-800 |
|
Main steam: |
460 t/h / 145 bar / 545 degrees |
|
Media: |
blast furnace gas, coke gas, natural gas, fuel oil light |
|
Execution period: |
2007-2008 |
Customer: |
Fernwärme Wien Gesellschaft m.b.H. |
|
Scope of work: |
Engineering, supply, assembly and commissioning, testing, training and documentation of the cooling plant, cooling converter station, pressure maintenance, stream cooling water system and district cooling pipe (DN400). |
|
Technical data: | Two absorption refrigerators with 5 MW each as well as one turbo compressor refrigerator with 7 MW inclusive pumps, fittings and pipes. | |
Total cool water max: |
|
|
Total hot water max: |
|
|
Execution period: |
2008-2010 |